Product Type
1400ZQB type
Power
600kW
Flow Rate
14400-28440m³/h
Head
1.9-8.1m
Amount (unit)
4
The reservoir area protection project of the Xinji Hydropower Station on the Hanjiang River in Hubei Province is a crucial supporting project for the cascade development of the middle and lower reaches of the Hanjiang River. It aims to address the issues of flood control safety, soil erosion, and the ecological environment after the water level in the reservoir area is raised. As a supplier of hydraulic mechanical equipment, leveraging its technical accumulation and engineering experience in the field of submersible electric pumps, it provides high-performance pump units and an automated control system for the project, ensuring the drainage efficiency and operational stability of the pumping stations.